Tapped out. From the taxing ourselves into oblivion department: TAPS will reach minimum flows (500,000 bpd) by 2015-2019. (LINK)
Sunday, September 19, 2010
Subscribe to:
Post Comments (Atom)
Tapped out. From the taxing ourselves into oblivion department: TAPS will reach minimum flows (500,000 bpd) by 2015-2019. (LINK)
Posted by AK Engineer at 9:42 AM
Subscribe to Alaska Gas Pipeline |
Visit this group |
No comments:
Post a Comment