The draft environmental impact statement is available: (LINK)
Showing posts with label EIS. Show all posts
Showing posts with label EIS. Show all posts
Saturday, February 4, 2012
ASAP Draft EIS Available
Posted by
AK Engineer
at
9:17 AM
0
comments
Labels: Alaska Stand Alone Pipeline, ASAP, EIS
Subscribe to:
Posts (Atom)
