Sasol GTL

Sasol has plans to pursue a Gas to Liquids (GTL) project on the Gulf Coast. (LINK).  Chesapeake has been saying GTL will sponge up the shale gas glut (LINK- see page 10).  Looks like they may be right.

Quote from the DownStream Today article:

Sasol Ltd. (SOL.JO, SSL), a chemical company long known for squeezing motor fuel out of coal, is now turning its sights on the glut of natural gas in the U.S.South Africa-based Sasol on Tuesday announced plans to build a plant, at a cost of as much as $10 billion, that would convert natural gas into diesel.

Sasol's board last week approved an 18-month feasibility study for the project, which would be constructed on land adjacent to Sasol's existing chemical facility in Louisiana.If given the final go-ahead, the plant would be the first in the U.S. to use so-called gas-to-liquids technology. Once seen as far-fetched and futuristic, the technology has gained traction in recent years as the discovery of gas supplies has outpaced that of oil.
 Anything that increases demand for lower 48 gas helps Alaska in the long run.  18 months seems like a long time for a study, but I still look forward to approval for projects like this.

Saturday, September 3, 2011

Alaska Gas Pipeline - PHMSA

The DOT is seeking proposals for work on the Alaska Gas Pipeline (LINK)

The U.S. Department of Transportation (DOT), Pipeline and Hazardous Materials Safety Administration (PHMSA) are seeking proposals from qualified contractors for a program titled "Alaska Gas Pipeline." PHMSA anticipates awarding up to three (3) Indefinite Delivery, Indefinite Quantity (IDIQs) for a period of one (1) base year and three (3) option years with a total maximum shared ceiling of $4.5 million. The purpose of this RFP is to find contractors who can provide assistance in the following program areas:

A. Materials
B. Construction
C. Environmental
The contract is for only $4.5 million, but it is a start.

Sunday, August 28, 2011

Gas to Gasoline?

Petroleum News carried additional details (LINK) on Janus Methanol chairman Deo van Wijk's ideas for un-stranding Alaska's natural gas. The idea is called "MTG" or Methanol to Gasoline. Given the dismal prospects of the umpteen dozen proposed gas lines maybe this idea is worth a second and even a third look.

In a nutshell van Wijk's concept is to convert Alaska's natural gas into valuable liquids and batch the liquids to market via the existing TAPS oil pipeline to Valdez and then on to markets where the material will trade as gasoline.

How it works - Cleaned up natural gas is converted to Syngas (carbon monoxide and hydrogen), Syngas is converted to Methanol (MeOH) and Methanol is converted to liquids, i.e. gasoline via a process owned by Exxon.

Quote from the Petroleum News article:
Using ballpark estimates of development costs on the North Slope, assuming for example a more than doubling of costs compared with a region such as the U.S. Gulf Coast, Van Wijk has estimated a $7.7 billion price tag for an initial two-train plant. Assuming a 20 percent return on investment over a 15-year period and a tax rate of 35 percent, gasoline could viably be sold at a price of $1.583 per gallon at a natural gas price of $2 per thousand cubic feet, Van Wijk said. The viable gasoline price rises with increasing natural gas prices, with the gasoline price reaching $3.458 at a natural gas price of $10 per thousand cubic feet, he said.
Van Wijk estimates the initial two train unit will produce 63,000 bbls per day of low sulfur low benzene gasoline. The economics, as stated look good, although where are North Slope gas producers going to get $10/MMBTU for their gas? (LINK TO VAN WIJK SLIDES)

The price of North Slope gas is really an imaginary number without other viable outlets. I figure that gas input to the facility should be at cost with gas producers compensated and tax assessed on the product stream ex-Valdez.

Van Wijk didn't indicate if the cost of a train includes gas pretreatment so let's tack on some capital cost for other items, say $1.3B for offsite utilities (gas treatment) , tankage at Valdez and assorted items along the pipeline. At $9B per two trains the project should still work.

What's good about this idea:

1) It converts Alaska's gas into revenue.
2) It's incremental, initial cost are more easily financed.
3) It fills the pipeline, extending the life of the pipeline.
4) It puts Exxon in the game as the technology licensing participant.
5) Fewer permits required, fewer jurisdictions.
6) It's an "All Alaska" option.
7) The incremental approach depressurizes the North Slope more gradually than a full size gas pipeline, i.e. it extends some oil field production.
8) There are actual buyers for the product.

Here's what people will hate about this idea:

1) No gas for Alaskans - Better start thinking propane
2) $500 Million for AGIA down the drain, maybe $1.5 Billion if damages are paid to TransCanada. Maybe the viability of MTG will force the discussion of AGIA feasibility.

Conclusion - I say why not - Van Wijk's team should press on and develop a full cost estimate. Clean up the concept and minimize capital installed on the North Slope. Get a proof of concept unit going on the Gulf Coast and iron out the arctic constructability issues.

Saturday, August 20, 2011

Natural Gas and the EPA Train Wreck

The Alaska Gas Pipeline has a few high drag problems, namely State of Alaska - Producer problems (Point Thomson / Fiscal structure) and market problems ($4/MMBTU gas / Shale gas / lack of customers).

Setting aside State of Alaska - Producer problems will the demand side ever tilt in favor of an Alaska Gas Pipeline? One factor of this equation may be new EPA regulations that impact coal fired power plants. The wave of new EPA regulations is known as the "train wreck".

Outfits like TVA are closing old coal plants (LINK) and building more nuclear and more gas fired combined cycle plants.

They say even a blind hog finds nut now and then, maybe an unintended consequence of the EPA Train Wreck will be higher gas prices and firm buyers for more gas.


Friday, August 19, 2011

Plethora of options

Tons of ideas out there, but still no buyers for Alaska gas. Here's links to pipeline related presentations submitted to the Senate Resources Committee this week :

Larry Persily, Federal Coordinator (LINK)
TransCanada (LINK)
Bill "Valdez LNG" Walker (LINK)
Malcolm Roberts (LINK)
Harold Heinze ANGDA (LINK)
David Gottstein (LINK)
AGDC, answers to 54 Wielechowski questions (LINK)
DNR Dan Sullivan, Gasline Update (LINK)
Dan "ASAP" Fauske (LINK)



No Precedent Agreements

That's the word from TransCanada (LINK to slides) in a presentation to Alaska State Legislature Senate Resources Committee on August 16, 2011. Here's a chilling quote from the slides.

"APP has not been able to secure Precedent Agreements with Shippers at this time"
No shippers, no buyers, no project. Tony Palmer, TransCanada VP was unable to show proof of project viability to lawmakers in testimony to the Alaska Senate Resources committee on Tuesday (LINK). Point Thomson is identified as the major sticking point. According to TransCanada:
"Resolution of Pt. Thomson and gas fiscals are essential to commercial success"
A solution to that problem may be in the works (LINK to Alaska Dispatch). Alaska Dispatch ran the Point Thomson story on the 15th however other news outlets have been slow to grasp the significance of an agreement on Point Thomson. The Fairbanks New-Miner has a followup story with no new content (LINK).

We do know that ExxonMobil has drilled a couple of wells (PTU-15 and PTU-16) in recent times and has plans to produce condensate as early as 2014. (USACE EIS LINK). At a minimum Exxon has more data and is in a good position to negotiate with the the Department of Natural Resources. (LINK to a good description of Point Thomson).

Sometimes it seems like this project is all lawyers, politicians, and guys in nice suits. It's good to see at least one outfit (Exxon) is out there, boots on the ground, building, drilling, hiring and making tangible progress. With a little luck maybe their success will get the ball rolling.

Wednesday, August 10, 2011

Exxon X120 Piple Welding

One way to improve the economics of a remote gas pipeline is to use stronger steel.

Here's a press release from Exxon on X12o pipe welding. (LINK).

Because I'm an optimist I read "Alaska Gas Pipeline" into this portion ofthe press release:





X120 ultra high-strength linepipe was jointly developed by ExxonMobil’s Upstream Research Company and Nippon Steel. X120 linepipe is 50 percent stronger than the strongest linepipe steel (X80) commonly used in gas transmission pipelines and is a cost effective and safe method of transporting natural gas from remote regions to urban customers using high-pressure, large-diameter pipelines.

Natural gas demand is forecast to grow 60 percent globally in the next 20 years. Many new gas resources required to meet this demand are in remote areas and will require cost-effective transportation options before they can be commercialized. The use of X120 linepipe could substantially improve the economics of long-distance pipelines used in the development of remote gas resources.